"The prototype works, the product does not."
Hand-built samples pass, then the first molded parts fail fit or finish. The design was never reviewed against the process that would make it.
Most teams can get a prototype. The hard part is the eleventh thousand unit, made by somebody else, on a schedule, at the cost you promised your board. That gap is the whole job — and it's what this team was built for.
When teams call us
Hand-built samples pass, then the first molded parts fail fit or finish. The design was never reviewed against the process that would make it.
Tooling, cycle time, material choice and assembly sequence were decided after the design froze, which is the most expensive possible order.
The design firm handed off a package. The factory is asking questions nobody can answer. Yield sits at 70% and every week costs a launch window.
The work
We keep design and process engineering in the same room. Every geometry decision is checked against the process that will produce it, and every process decision is checked against the experience of the person holding the product.
That isn't a philosophy, it's a scheduling choice: the DFM review happens in week two, when changing a wall thickness costs an hour, not in month four when it costs a tool.
The five gates
Each gate produces a document, not a status update. If a gate is skipped, the cost shows up later with interest. So we don't skip them.
Materials and processes
We keep a broad material library in-house rather than quoting whatever a partner happens to stock. Below are the families we run most often.
| Process | Material | Min precision | Lead time | Part |
|---|---|---|---|---|
| Rapid sand casting | Sand | 0.02 mm | 3–5 days | Turbine sample, single unit |
| FDM | PLA | 0.05 mm | 1 day | 700 assembly fixtures, 65 × 65 × 4 mm |
| CT reverse modeling + print | PLA | 0.05 mm | 1 day | Bone model from patient scan |
| Stereolithography (SLA) | Photosensitive resin | 0.1 mm | 5 days | Positioning wristband, ≤ 50 × 50 mm |
| FDM, large format | PLA | 0.2 mm | 10 days | 4000 × 2000 × 200 mm site model |
These are the values we held on those jobs, not catalogue minimums. A tolerance we haven't proven on your geometry is a tolerance we won't quote.
Related work
Two programs where the tolerance and the deadline were the whole problem.
A single turbine sample that traditional casting couldn't justify. We reduced a multi-stage mold workflow to two steps and supplied sand molds that plug into the customer's existing line.
0.02 mm minimum precision · 3–5 days · rapid sand casting
Read the programAn electronics factory took an urgent order and needed to expand its line immediately. The injection molder declined the quantity. We ran it on a flexible line instead of a tooling cycle.
700 sets delivered on time · 1 day · 0.05 mm precision
Read the programA STEP file, a drawing, or a photo of the part that keeps failing. We will come back with where we think the cost and the risk are.