If you cannot see the plant, you are guessing.

Most factories run on a whiteboard, a spreadsheet and one engineer who has been there eleven years. We replace that with a live model of the plant, tied to the machines on it. So layout, routing and equipment status become things you can look at instead of ask about.

The system, in three layers

See it, simulate it, connect it.

These aren't three products. They're three layers of the same model, which is why they stay consistent when the plant changes.

LAYER 01 — 3D VISUALIZATION

A digital twin that matches the building

Greenfield and brownfield sites modeled to the same standard, so a new plant and an existing one can be compared in the same environment. Walk the layout, inspect equipment from any angle, and run interference and evacuation analysis before anything is installed.

Input: CAD, point cloud scans, equipment specs Output: navigable 3D plant, VR/AR ready
LAYER 02 — PROCESS MANAGEMENT

Simulate the route before you commit capex

Process options are generated directly from the 3D equipment model. Draw the routing between stations and run the production sequence. Then read the report on equipment order, machine utilization and throughput before a purchase order exists.

Input: equipment list, cycle times, takt target Output: routing model, utilization report, schedule basis
LAYER 03 — EQUIPMENT STATUS

One-to-one mapping to the real machines

IoT gateways and sensors link the digital model to the physical line, machine by machine. Motion, temperature and operating state become live attributes on the model — visible and actionable rather than buried in a PLC.

Input: sensor and gateway install, PLC tags Output: live status, alarms, historical trends
LAYER 04 — SYSTEM BACKBONE

The systems underneath, deployed and connected

A twin is only as good as the data feeding it. We deploy and integrate the systems of record, PDM, PLM, MES, WMS and OA, so the model reads from a single source instead of a nightly export.

Systems: PDM · PLM · MES · WMS · OA Output: one source of truth, integration contracts

Systems of record

What each system decides.

Buyers usually ask which of these they need. The honest answer is that the order matters more than the list.

PDM
Product data management. One controlled version of every drawing, model and revision. If engineers are still emailing STEP files, this is the first thing to fix — everything downstream depends on it.
PLM
Product lifecycle management. Requirements, BOM structure, change control and release process across the product's life. Comes after PDM is trusted, not before.
MES
Manufacturing execution. Work orders, routing, in-process inspection and traceability on the floor. This is where a twin stops being a picture and starts driving work.
WMS
Warehouse management. Location control, picking logic, inbound and outbound flow. Usually the fastest payback of the five, because the waste is easy to see.
OA
Digital office workflow. Approvals, document routing and the operational paperwork that otherwise lives in chat threads.
CAD / CAE / CAM
Environment engineering for the design and simulation toolchain — license strategy, template standards, and the automation that stops engineers repeating the same setup.

The sequence

Most plants buy these in the wrong order.

The order below is the one that survives contact with reality. Skipping a step doesn't save time; it moves the cost to the next system.

01 / DATA

Get the drawings under control

PDM before anything else. A twin fed by uncontrolled files is a very expensive rendering.

02 / MODEL

Model the plant as it is

Scan and model the existing floor before designing the future one. Brownfield reality beats greenfield optimism.

03 / SIMULATE

Test the routing in software

Run the layouts and the takt assumptions while changing them is still free.

04 / CONNECT

Wire the machines last

Sensors and gateways only after the model is right. Otherwise you instrument a mistake.

Related work

A plant you can see, and the toolchain that feeds it.

One digital factory deployment, and the CAD/CAE environment that supplies the model it runs on.

Digital factory · Solar manufacturing

3D visualization, process management and equipment status

Built on our own digital production platform: factory visualization, process routing and live equipment status, with a seamless connection from design drawing through to equipment code.

Three layers plant model · process routing · machine status

Read the program
Industrial software · CAD / CAE / CAM

The model that a twin is built from

XCAD drafting and modeling, CAE topology optimization and CAM toolpath generation — where the geometry a plant is simulated from gets created and validated.

5.7 → 3.0 on the optimization example, still 3-axis machinable

Read the program

Building a line, or fixing one you cannot see?

Send a layout, a photo of the floor, or the equipment list. We will tell you what a twin would change — and whether it's worth building yet.